How our partners experience data-driven construction:
from the field. From the pour. From actual results.

BEYOND – Tallest Tower in Israel

"After experiencing the cost of proceeding too early, we relied on GreenVibe's Sensors when a similar situation occurred and avoided another failure. It gives us the confidence to make critical decisions based on what is actually happening inside the structure."

Shalom Buchnick TidharProject Manager
Read the case study

DATA Center Shoham

"GreenVibe gave us the confidence to make decisions based on what was actually happening inside the concrete. We were able to remove formwork earlier, optimize the concrete mix and reduce costs — while maintaining the required performance and construction schedule."

Israel Glick Minrav GroupProject Manager
Read the case study

Route 22 Bridge Jerusalem

"The GreenVibe system enabled a significant shortening of the project's critical path by reducing the waiting time between pouring and tensioning to only about two days, compared to approximately four days in the past."

Amit - Shoham Eng.Project Manager
Read the case study

Herzeliya Israel, Office and Residential Building

"Using the sensors definitely made my daily work easier. It saved me from having to deal with the lab." "Instead of waiting for a four-day lab test that actually arrives after six days and creates a lot of headaches, I can approve the next stage based on the concrete strength shown in the app."

Guy - AshtromSite Engineer
Read the case study